- (Topic 7)
You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods.
The company must track variances in material compared to the original estimated amount. You must only use one picking list journal for each production order.
You need to post a picking list that accounts for the material required to produce 105 finished goods.
What should you do?
Correct Answer:B
- (Topic 7)
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution.
NOTE: Each correct selection is worth one point.
Correct Answer:ABC
HOTSPOT - (Topic 2)
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Solution:
Does this meet the goal?
Correct Answer:A
HOTSPOT - (Topic 5)
You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Solution:
Does this meet the goal?
Correct Answer:A
- (Topic 7)
You are configuring a service management system that includes subscription billing.
The current system lacks functionality to accurately calculate and collect data about accrued subscription revenue.
You need to set up the accrual of subscription revenue to ensure accurate financial reporting.
Which two actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
Correct Answer:BC